New Nuclear

EDM number 537 in 2013-14, proposed by Paul Flynn on 08/10/2013.
Categorised under the topics of Nuclear power and Renewable energy.

That this House is appalled at the record of delays and cost overruns of new nuclear plants; notes the French designed Olkiuoto plant started construction in May 2005 had an original promised completion date in 2009, and that construction costs have doubled and completion delayed to 2016; further notes that the similar designed Flamaville plant is suffering a three year delay with costs rising from ?3.3 billion to ?8.5 billion; further notes similar problems occurred at the construction of China's Sanmen plant; believes that the new generation nuclear plants are even more unreliable than earlier plants such as Fukushima Daiichi; and calls on the Government to stop dreaming up ever more exotic subsidies to attract new foreign investors, and to support sustainable renewable energy plants producing clean and green electricity from ever lasting energy sources such as wave, wind and solar.

This motion has been signed by a total of 14 MPs.

MPDateConstituencyPartyType
Paul Flynn08/10/2013Newport WestLabourProposed
Mark Durkan08/10/2013FoyleSocial Democratic and Labour PartySeconded
Margaret Ritchie08/10/2013South DownSocial Democratic and Labour PartySeconded
Jeremy Corbyn08/10/2013Islington NorthLabourSeconded
Michael Weir08/10/2013AngusScottish National PartySeconded
Martin Caton08/10/2013GowerLabourSeconded
Ronnie Campbell08/10/2013Blyth ValleyLabourSigned
Alasdair McDonnell10/10/2013Belfast SouthSocial Democratic and Labour PartySigned
Mike Hancock14/10/2013Portsmouth SouthLiberal DemocratSigned
John McDonnell14/10/2013Hayes and HarlingtonLabourSigned
Virendra Sharma16/10/2013Ealing, SouthallLabourSigned
Caroline Lucas21/10/2013Brighton, PavilionGreenSigned
Martin Horwood04/11/2013CheltenhamLiberal DemocratSigned
Roger Godsiff02/12/2013Birmingham, Hall GreenLabourSigned