Cycle Provision At Birmingham New Street Station
EDM number 472 in 2010-12, proposed by Roger Godsiff on 12/07/2010.
Categorised under the topic of Cycling.
That this House notes with dismay Network Rail's lack of foresight, imagination and vision in its planning of cycle-friendly facilities at the new New Street Station; further notes that only a total of 57 places will be provided for cycles compared with, for example, the 3,000 available at Amsterdam Centraal Station and 1,200 at Berlin Hauptbahnhof; further notes that the Dutch rail authorities plan to boost capacity nationally to 100,000 places; believes that National Rail needs a dramatic rethink in its cycle provision at New Street and all other stations; and further believes that the Government should meet Network Rail as a matter of urgency to discuss ways to increase and stimulate cycle usage and reduce dependency on car-based commuting.
This motion has been signed by a total of 10 MPs, 1 of these signatures have been withdrawn.
MP | Date | Constituency | Party | Type |
---|---|---|---|---|
Roger Godsiff | 12/07/2010 | Birmingham, Hall Green | Labour | Proposed |
Peter Bottomley | 13/07/2010 | Worthing West | Conservative | Seconded |
Paul Flynn | 14/07/2010 | Newport West | Labour | Seconded |
Virendra Sharma | 14/07/2010 | Ealing, Southall | Labour | Seconded |
Jeremy Corbyn | 14/07/2010 | Islington North | Labour | Seconded |
John Leech | 14/07/2010 | Manchester, Withington | Liberal Democrat | Seconded |
Eric Illsley | 15/07/2010 | Barnsley Central | Labour | Withdrawn |
John McDonnell | 19/07/2010 | Hayes and Harlington | Labour | Signed |
Jim Cunningham | 19/07/2010 | Coventry South | Labour | Signed |
John Hemming | 19/07/2010 | Birmingham, Yardley | Liberal Democrat | Signed |
Download raw data as csv or xml.